Brooke Army Medical Center, Fort Sam Houston, TX
Contract value: $4.6M
ESA replaced the roof and lightning protection system on this active medical facility. The scope of work included replacement of a safety handrail system and damaged electrical conduit; installation of EPDM roof system; and replacement of roof drains and blocking, curbing, and flashing. The lightning system was removed and replaced with a new UL rated system. Our teams are trained to be able to adapt and pivot, if necessary, when working at active medical facilities.
Bay Pines VARO, St. Petersburg, FL
Contract value: $8.7M
ESA was contracted to remove existing roof deck and supporting structure, remediate interior mold, repair building envelope, and install new insulated roof assembly and cold-formed framing structure. Additional scope was added to develop a plan to reseal the building envelop and solve water intrusion issues associated with the building's skylight.